Hi Srinath,
In addition to Kumars, Suggestion to look in COOIS, you can create a status selection profile in configuration (Tcode: BS42) and give the status which include CNF (as you have done confirmation) Does not include PCNF (as you wont want to do GR for Partial confirmation), does not include DLV (as that need to be done) and does not include TECO/CLSD
once you have create the selection profile, you can enter that in COOIS to get the desired list of production orders
Suraj