Hello Experts,
I was hoping that maybe some of you guys could give me a hint here.
The situation is as follows.
Our customer has two SAP systems, A and B. They are linked via ALE, so any PA posting made will go from A to B through an IDoc (IDoc with CODCMT is created).
The issue is that, whenever Actual Line Items are posted through actual assessment cycles they do generate an IDoc that travels to the other systems where the allocation takes place (hence we have no issues with this escenario).
Whenever Plan Items are posted via plan assessment cycles they don't generate an IDoc so Planning between systems A and B is inconsisten until a roll-up takes place at the end of month. They do need this information to travel everytime a plan line item is created for budgeting purposes.
Everything is set up right now and the connections are working properly because Actual Line Items are being transferred just fine. We need to know how to enable plan allocations to go from A to B as it's done for actual allocations.
We have checked on OSS note 630051 but without success.
I appreciate any help given.
Thanks in advance,
Ivan