Dear Venkatesh,
As said,I have changed the base entitlement period to Calender year.
And I run the Pre-Separation Action,then I have run the PT60. it is pro-rating one month Quota. Quota validity period is 21.06.2014 to 31.12.2014. Total Quota per year is 20.
So 20/12=1.6 Days / Month. for June 1.6/30*10= 0.5479 Days.
Pre-Separation run on 13.10.2014. I want to pro -rate the Quota up to 13.10.2014
Please guide.
Thanks

