Hi Srinivas,
The following order categories do not allow manual reservations:
.- 10 PP production order
.- 20 network
.- 30 maintenance order
.- 40 batch order (process manufacturing)
.- 50 inspection lot
So, I don't think that manual reservation is possible in this case as per standard SAP.
Thanks,
Tajinder