Re: How system behaves when ATP with future and current orders with ready and future orders..

$
0
0

Check the below settings;

1) In the material master MRP views, any replenishment lead time has been set

2) In the scope of availability check (t.code OVZ9), look for the settings "Check without replenishment time" . If the field is not checked, then it uses the replenishment time of the material master to confirm.

 