Hi Ayoub,
Indeed in the material master of material 51134352, the Prod. stor. location is not maintained (although the Storage loc. for EP is maintained as 1082).
1. Is this causing the issue.
2. The user wants to input the storage location directly at the order level based on the F4 options.
Is that feasible anyhow?
3. The process order is already in TECO status. As a workaround I guess that after revoking the TECO and re-reading master data, if they again release the order the correct storage location will be picked up for the component. Please validate my understanding.
Thanks and regards,
Kaushik