Hi Sandip
We can generate automatic multiple batch at the time of GR from Production.
Let us consider, Production Order Quantity is 100.
1. Do GR from Production in MIGO or MB31 with 101 Movement Type.
2. While doing GR enter the quantity as 50 and check (F7) then system will generate batch automatically if the Material is having Batch Management check in the Material Master.
3. DO GR for remaining quantity 50 and check then system will generate automatic batch.
Please do check and revert back.
Regards
Suresh.M