I do not think, IW13 (Material Where used List) and IW3M (List of Goods Movement for Order, will help. because these report will not show the labor cost.
better use IW39/IW38 to get the total cost (Plan and Actual) at work order level
I do not think, IW13 (Material Where used List) and IW3M (List of Goods Movement for Order, will help. because these report will not show the labor cost.
better use IW39/IW38 to get the total cost (Plan and Actual) at work order level