Heuristic Run Time

$
0
0

Hello Gurus:

 

I've recently changed our SNP to run for all materials (not just finished goods).  I have some subassemblies that go into about 400 different finished goods.  In Customizing, I had "Heuristic:  Nbr of Planning Iterations per Component" set at 10 and I found that it wasn't planning at the subassembly for all the finished goods' demand.  I think I have to change this value to 400 for it to complete planning on all subs/finished goods.  However, when I do this and run the Heuristic for my entire Model, it runs over 16 hours and never completes. 

 

Does anyone know if this is a setup issue or a resource issue on the system?  Is there something I can do to make the Heuristic run faster?  I calculate pegging and Low Level Codes in a separate step prior to the Heuristic run and my settings on the Heuristic are as follows:

 

Location Heuristic

Take into account found components in planning run

Add products from super session chain

Source Determination = All Levels

Do Not use Temporary Low Level Codes

 

I do not have checked "Net Change Planning" because we are only running the Heuristic once a month to do Capacity Analysis.

 

We have about 30,000 materials that the heuristic is running on and planning.

 

Any ideas are greatly appreciated.

Andrea